|

|
Building
| Noviter
boiler plants can be installed in an old boiler room or in another
existing building. |
 |
 |
The
best technical results, however, can usually be achieved by constructing a
new building. |
|
The
plant can be completely factory-made, and delivered to the site in
one or more prefabricated blocks. The installation time for these
blocks can be as short as a few days. The largest factory-made boiler
plants consist of about ten blocks, in which case the installation
time is a few weeks. |
 |
|